Claims Advisor
Construction claims assessment and entitlement analysis
Beta module: functional, with verification in progress.
Code references
Inputs
| Parameter | Unit |
|---|---|
| Planned Start | — |
| Planned End | — |
| Actual Start | — |
| Actual End | — |
| Site Overhead / Day | SAR |
| Planned Productivity | units/day |
| Actual Productivity | units/day |
| Total Planned Quantity | — |
| Unit Rate | SAR |
| Delay Events (JSON array) | — |
Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.
Related calculators
Contract Analyzer
BetaFIDIC/NEC4 contract clause analysis and risk identification
Clause Risk Scorer
BetaContract clause risk scoring from contractor/employer perspective
Variation Valuation
BetaContract variation pricing with measured rates and daywork
Delay Analysis
BetaCritical path delay analysis per SCL Protocol
Payment Analysis
BetaInterim payment certificate analysis and cashflow
Notice Tracker
BetaContractual notice period compliance and tracking
Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.
Frequently asked questions
- What does the Claims Advisor calculator do?
- Construction claims assessment and entitlement analysis. It references FIDIC §20.
- Which Saudi Building Code references does the Claims Advisor calculator use?
- The Claims Advisor calculator references FIDIC §20.
- What inputs does the Claims Advisor calculator need?
- The Claims Advisor calculator takes 10 inputs: Planned Start, Planned End, Actual Start, Actual End, Site Overhead / Day (SAR), Planned Productivity (units/day), Actual Productivity (units/day), Total Planned Quantity, Unit Rate (SAR), Delay Events (JSON array).
- Is the Claims Advisor calculator verified?
- Claims Advisor is a beta module. It works, but verification is still in progress. Its results carry documented limitations and require review by a licensed SCE-registered engineer before submission or site execution.