Skip to content
inshaBY SCHNELL
PlanningVerified

Earned Value

Earned value management metrics (CPI, SPI, EAC, ETC)

Verified module: SI units, SBC-referenced, deterministic, with documented verification metadata.

Code references

PMI PMBOK

Inputs

ParameterUnit
Budget at CompletionSAR
Planned Value to DateSAR
% Physical Complete%
Actual Cost to DateSAR

Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.

Related calculators

Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.

Frequently asked questions

What does the Earned Value calculator do?
Earned value management metrics (CPI, SPI, EAC, ETC). It references PMI PMBOK.
Which Saudi Building Code references does the Earned Value calculator use?
The Earned Value calculator references PMI PMBOK.
What inputs does the Earned Value calculator need?
The Earned Value calculator takes 4 inputs: Budget at Completion (SAR), Planned Value to Date (SAR), % Physical Complete (%), Actual Cost to Date (SAR).
Is the Earned Value calculator verified?
Earned Value is a verified module: SI units, SBC-referenced, deterministic, with documented verification metadata. Like all Insha by Schnell outputs, its results require review by a licensed SCE-registered engineer before submission or site execution.