PlanningVerified
Schedule Risk
Analytical (CLT) schedule risk analysis per AACE RP 57R-09 (not a Monte Carlo simulation)
Verified module: SI units, SBC-referenced, deterministic, with documented verification metadata.
Code references
AACE RP 57R-09
Inputs
| Parameter | Unit |
|---|---|
| Schedule Activities (JSON array) | — |
| Risk Events (JSON array) | — |
Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.
Related calculators
Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.
Frequently asked questions
- What does the Schedule Risk calculator do?
- Analytical (CLT) schedule risk analysis per AACE RP 57R-09 (not a Monte Carlo simulation). It references AACE RP 57R-09.
- Which Saudi Building Code references does the Schedule Risk calculator use?
- The Schedule Risk calculator references AACE RP 57R-09.
- What inputs does the Schedule Risk calculator need?
- The Schedule Risk calculator takes 2 inputs: Schedule Activities (JSON array), Risk Events (JSON array).
- Is the Schedule Risk calculator verified?
- Schedule Risk is a verified module: SI units, SBC-referenced, deterministic, with documented verification metadata. Like all Insha by Schnell outputs, its results require review by a licensed SCE-registered engineer before submission or site execution.